This Lyonnais work, designed by Tony Garnier in 1919 and listed in the Historic Monuments, will thus be a real cure of youth: the facades will be taken over, the circulations made free through the stadium.
And for the comfort of the spectators, the 2 lateral stands will be completely rebuilt, the upper lodges renovated and served by panoramic elevators.
'Bars matches' will be created in these new forums: convivial spaces open on large terraces, they will also be able to host seminars, conferences, etc., outside the days of the match.
A challenge like Eiffage Construction knows how to meet them.
* Lyon Olympic University
Turnover: € 18m
Owner: LOU Rugby
Project Manager: AIA Associés
Framing
Price studies: Sylvain Poropane,
Pierre-Marie Cancian and Hassan Dikmen
Director of works: Yannick Perrin
Crew members: Nicolas Gallon, Pascal Clet, Dimitri Garcia, Wilson Humbert, Martin Lefort, Grégory Caire, Joël Roux
And José Teixeira
Team corps d'état: Frédéric Flammier, Maxime Tessier and Rémi Trouillet
-
30.04.2024A feminine head for Harwig, a subsidiary of Eiffage...Since 2022, Maureen Nederhoed has been the general manager of Harwig, a subsidiary of Eiffage Energie Systèmes in the Netherlands. She perpetuates the family saga...
-
30.04.2024Environment: Eiffage Strengthens Its Biodiversity Charter...Having already made commitments to sustainable development, biodiversity, water and aquatic environments, low carbon, and circular economy, the Eiffage Group is...
-
17.04.2024Caïus 2024: Eiffage wins two awardsDaniel Buren's artwork "Like colors fallen from the sky, in situ and in motion," temporarily exhibited at the Liège train station in Belgium and supported by Eiffage,...